• Culture
      • Back
      • Our Story
      • Sustainability
      • Aspire
      • Indigenous
      • Community
  • People
      • Back
      • Our Leadership
          • Back
          • OA People Details
      • Careers
  • Services
      • Back
      • Practice Areas
          • Back
          • Structural Engineering
          • Building Science
          • Structural Restoration
          • Structural Glass Engineering
          • Parking Facility Design
          • Audits & Studies
          • Building Energy Modelling
      • Service Areas
          • Back
          • Bridge Design & Rehabilitation
          • Building Enclosures
          • Building Energy Modelling
          • Civil Engineering
          • Cold-Formed Steel Design
          • Condition Assessments
          • Depreciation Reports & Reserve Fund Studies
          • Façade Engineering
          • Fall Protection & Maintenance Access Systems
          • Forensic Engineering
          • Heritage Conservation
          • Parking Facility Design
          • Parking Structure Restoration
          • Pavement Rehabilitation
          • Performance Assessment
          • Post-Tensioned Concrete
          • Prime Consulting
          • Rendering & Interactive Visualization
          • Roofs & Plaza Decks
          • Seismic Risk Mitigation
          • Specialty & Supplementary Engineering
          • Structural Engineering
          • Structural Glass Engineering
          • Structural Restoration
          • Sustainable Design
          • Traffic Deck Protection & Replacement
          • Waterproofing
          • Wood Design
  • Projects
      • Back
      • Structural Engineering
      • Building Science
      • Structural Restoration
      • Structural Glass
      • Parking Facility Design
      • Building Energy Modelling
      • Audits & Studies
  • Media
      • Back
      • News
      • Blog
      • Brochures
      • Videos
      • Published
      • Research
  • Locations
  • Search

  • EN
  • FR
  • Culture
    • Our Story
    • Sustainability
    • Aspire
    • Indigenous
    • Community
  • People
    • Our Leadership
    • Careers
  • Services
    • Practice Areas
    • Service Areas
  • Projects
    • Structural Engineering
    • Building Science
    • Structural Restoration
    • Structural Glass
    • Parking Facility Design
    • Building Energy Modelling
    • Audits & Studies
  • Media
    • News
    • Blog
    • Brochures
    • Videos
    • Published
    • Research
  • Locations
  • Search

  • EN
  • FR

Keeping to the Building Code

INDUSTRY INSIGHTS, Canadian Property Management | May 2018
Terry Bergen, CTech, CCCA, LEED® AP | Managing Principal

Staying current with property construction and retrofit guidelines. Recent and potential changes to Canada’s National Building Code are giving property stakeholders more to consider when it comes to retrofits and new constructions. A bulk of those changes stem from the country’s mission to adopt a “net-zero energy ready” model building code by 2030 – a move that will hold new property constructions to more stringent energy usage guidelines, inspire new standards for building equipment and guide energy efficient improvements during retrofits and renovations.

Read more

Top Considerations for Parking Garage Restorations

INDUSTRY INSIGHTS, CondoBusiness | April 2018
Michael Pond, P.Eng. | Principal

“Repair or upgrades to underground parking garages can be a massive undertaking, and we regularly see certain aspects of these projects that are commonly overlooked or not fully considered,” says Michael Pond, Principal, Building Science and Restoration with RJC Engineers (RJC). Certainly, it pays to have a solid plan before heading below. Here are some considerations to keep in mind.

Read more

New Student Centre - York University | Project Profile

Award Magazine | April 2018

The 126,000-square-foot New Student Centre at York University in North York, Ontario is unique in many ways, particularly since it is a levy-funded, student-driven project. Approved by a referendum in 2013 by the largest student-voter turnout in Canadian post-secondary history – with 90 percent voting in favour – the new centre is welcomed with open arms by everyone on campus.

Read more

Laurier Brantford YMCA | Project Profile

Award Magazine | April 2018

The ideal partnership is one in which close collaboration benefits multiple parties, and this is certainly the case with the Laurier Brantford YMCA Athletic and Recreation Centre, which is the outcome of the City of Brantford teaming with Wilfred Laurier University in 2012 to create a new recreation complex for university students as well as the entire community. Located between two parallel streets running east/west that have a 35-foot height differential, the massive 118,000-square-foot facility consists of an elevated rectangular two-storey “Bar-Building” on Colborne Street.

Read more

Centre for Collaborative Education (CFCE) | Project Profile

Award Magazine | April 2018

The four-storey, 75,000-square-footfacility was designed by Montgomery Sisam Architects in a joint venture with Architecture Counsel Inc. as an educational access point for students, while bringing together local, indigenous, and global community groups as well as members of key business sectors. It replaces DC’s Simcoe building, which was built as a temporary structure and opened in 1969.

Read more

989 Johnson | Project Profile

Award Magazine | April 2018

Namely, 989 Johnson is another project in which Cox president Dan Cox and his father, Steve Cox, wanted to provide something unique to residents: two 15- and 17-storey glass towers with 206 homes of varying shapes and sizes, rising from an angular six-storey podium that resembles boxes stacked unevenly against and on top of each other. Read more about the design and its purpose.

Read more

A Property for All Seasons

INDUSTRY INSIGHTS, Canadian Property Management | March 2018
Duncan Rowe, BASc, MEng, P.Eng., LEED® AP BD+C | Associate/Sustainable Design Specialist

Determining a property’s ability to withstand the elements is best done before it’s put to the test. And yet, for many property managers and owners, climate resiliency remains low on their list of priorities. “The awareness is there, but it’s not high on people’s radars,” says Duncan Rowe, Associate with RJC Engineers (RJC). “In my experience, climate resiliency is something people only become aware of after an event like a flood or storm. A majority aren’t planning for those factors ...

Read more

Form Fitting

Alberta Innovators, Career Profile | March 2018
Frank Prosperi-Porta, BASc, P.Eng. | Principal

Frank Prosperi-Porta's decades-long career with RJC Engineers was built on a fascination of all things structural and suits him well. Now RJC’s managing principal for the structural engineering team in the Edmonton office, Prosperi-Porta began his career after graduating from UBC with a Bachelor of Applied Science in structural engineering. He recalls his eagerness to roll up his sleeves and begin work out of the Vancouver office in 1974, where he would cut his teeth for five years before heading east for Toronto.

Read more

A New Age for Sustainable Projects

INDUSTRY INSIGHTS, Canadian Facility Management & Design | February 2018
Duncan Rowe, BASc, MEng, P.Eng., LEED® AP BD+C | Associate/Sustainable Design Specialist

To reach Canada’s and Ontario’s environmental commitments, the property management industry needs to renovate 3 per cent of its existing stock every year for the next 33 years. It’s no easy task, and it’s one that all stakeholders are committed to improving building efficiencies, reducing energy usage, and making other eco‐forward investments. Fortunately, the tide is turning. Industry trends point to a renewed focus on sustainability, both to the benefit of owner budgets and tenant comfort.

Read more

Pason Centennial Arena | Project Profile

Award Magazine | February 2018

Seamless. That’s how people are describing phase II of the Pason Centennial Arena expansion project, which wrapped in early January of this year. The first phase – a 1,500 - seat, 2,000-person capacity arena – was already one of the premier facilities within the Alberta Junior Hockey League. This final phase includes one NHL-sized ice surface, a leisure ice surface, five dressing rooms, three multi-purpose rooms, and bumps the 4,500-square-metre original build up to 8,500 square metres.

Read more

Page 26 of 28

  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
Back to Published Items
Follow us on Instagram Connect with us on LinkedIn

RJC Engineers

CareersPrivacy PolicyAccessibility PolicySite MapNewsletter - Subscribe
Calgary Web Design by Blue Ocean
© 2025 Read Jones Christoffersen Ltd. All Rights Reserved.

General Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Media Relations

Please let us know your name.
Please let us know your email address.
Invalid Input

Vancouver Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Surrey Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Victoria Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Nanaimo Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Kelowna Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Calgary Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Edmonton Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Saskatoon Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Toronto Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Ottawa Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Kitchener Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Kingston Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

RJC News

Stay up to date on industry and RJC news, events, trends, innovations and projects.

Please let us know your email.
Please let us know your first name.
Please let us know your last name.
Invalid Input
Invalid Input

By submitting this form, you are consenting to receive marketing emails from: RJC Engineers, 1285 West Broadway, Suite 300, Vancouver, BC, V6H 3X8, CA, http://www.rjc.ca. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact.

Montréal Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Prince Edward Island Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Reno Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Las Vegas Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

Halifax Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input

London Inquiries

Please let us know your name.
Please let us know your email address.
Invalid Input